Additional project records

More of our work.

A working list compiled from Notmar project records. Names and scopes are being reviewed; dates refer to the records. Project values are omitted.

View the main portfolio

2022 final claim

NCB Junction

Fire alarm system supply and installation.

2024 final claim

JMMB Liguanea

Fire detection and suppression works.

2022 claim; 2026 service correspondence

NHT Ruthven Towers

Electrical and mechanical services; fire alarm maintenance appears in later records.

2015 final claim

GWEST

Fire system piping.

2017–2018 final invoices

Grand Bahia Principe

Kitchen fire protection work and fire equipment.

2019 final invoice

Rainforest Seafood, Slipe Pen Road

Installation of a kitchen suppression system.

2019 final invoice

JPS, West King House Road

Fire suppression work.

Final claim on record

NCB Fairview

Fire protection works.

2017 final invoice

Constant Spring Texaco

Project assignment; detailed scope to confirm.

2018 final claim

Renfrew Hotel

Fire sprinkler and fire alarm works. Check against the existing S Hotel entry to avoid duplication.

2017–2018 final invoices

VIP Attractions — MBJ lounge

Fire alarm and sprinkler systems.

2018 final invoice

NCB Mandeville branch

Fire alarm works for branch renovation.

2018 final invoice

Jewel Dunn’s River

Project assignment; detailed scope to confirm.

2018 final invoices

Tracks & Records

Kitchen suppression system and fire alarm installation.

2018 final invoice

Free Masonic Building

Fire alarm system installation.

2018 final invoice

Coral Cliff

Project assignment; detailed scope to confirm.

2019 final invoices

Spanish Court Hotel

Work at the hotel; detailed scope to confirm.

2018 final invoices

Shipping Association of Jamaica

Project assignment; detailed scope to confirm.

2018 final invoice

Watermill Apartment, Ocho Rios

Fire equipment installation.

2019 final invoice

Trelawny Credit Union

Project assignment and variation; detailed scope to confirm.

2018 and 2019 final invoices

NCB Atrium

Project assignment with Denron Engineering; detailed scope to confirm.

2020 final invoice

Seprod

Pump supply.

2020 final invoice

State Mall — CashWiz and Supreme Ventures

Work at the two premises; detailed scope to confirm.

Final invoice on record

Flow, Pembroke Hall Exchange

Project assignment; detailed scope to confirm.

2020 final invoice

Flow, Moneague Exchange

Work at the exchange; detailed scope to confirm.

Final invoice on record

Flow, Church Street

Work at the exchange; detailed scope to confirm.

2020 final invoice

Flow, Mandeville Exchange

Work at the exchange; detailed scope to confirm.

Final invoice on record

Flow, Ocho Rios Exchange

Fire suppression work.

2020 final invoice

Flow, Brown’s Town Exchange

Work at the exchange; detailed scope to confirm.

2014 final invoice

Flow, Bull Bay

Project assignment; detailed scope to confirm.

2020 final invoice

NCB / AIC North Towers

Supply and installation of a fire alarm panel.

Final invoice on record

Jamaica Broilers

Installation of a Fike annunciator.

2020 final invoice

Portmore Municipality

Fire alarm assignment.

2019 final invoice

Whitter Village

Electrical items for a pump.

2020 final invoice

Oceana

Fire alarm panel CPU supply and replacement.

2020 final invoice

P. A. Benjamin

Floor drains.

2020 final invoice

A & A Equipment

Project assignment; detailed scope to confirm.

2018 final invoice

Excellence Hotel

Kitchen system repairs.

2018 final invoice

King Alarm — Bernard Lodge warehouse

Warehouse assignment; detailed scope to confirm.

2016 final invoice

BNS Premier

Assignment through Lesmack; detailed scope to confirm.

2017 final invoice

Jamalco — St. Jago

Assignment at St. Jago; detailed scope to confirm.

Final invoice on record

JPS — Stadium and Washington Boulevard

Project assignments; detailed scope to confirm.

Servicing final invoice on record

UWI Basic Medical Sciences Complex

Servicing and devices. Separate from the earlier installation reference.

2017 final invoice

Appleton Estate

Project assignment; detailed scope to confirm.

2020 final claim

LASCO warehouse

Fire hose reels and extinguishers.

2014–2015 final account records

BTP / Kier

Project assignment and as-built drawings; facility name and scope to confirm.

2015 final invoice

Flow, Portmore

Work at the exchange; detailed scope to confirm.

Final invoice on record

J. Wray & Nephew — Twickenham warehouse

Warehouse repairs; detailed system scope to confirm.

2016 final invoices

J. Wray & Nephew — Warehouse 9

Sprinkler system and related variations.

2016 final invoices

J. Wray & Nephew — pump installation

Pump installation and associated supply-line work.

2019 final invoice

J. Wray & Nephew — water tank

Water tank assignment; detailed scope to confirm.

2017 final invoice

Iberostar — Star Café

Materials for the Star Café assignment; detailed scope to confirm.

2017 records

Iberostar — servicing

Servicing and repairs; detailed scope to confirm.

2015–2020 final invoices

Couples Swept Away

Kitchen suppression and associated service work.

2020 final invoice

MBJ — immigration area

Immigration area modification work; detailed scope to confirm.

2019 final invoice

MBJ — WEPRO sprinkler works

Sprinkler works; check against the existing airport references for overlap.

Final invoice on record

Synergy — Bessa Phase 2

Project assignment; detailed scope and facility name to confirm.

2020 final invoice

Tru Finishes

Project assignment; detailed scope to confirm.

Final invoice on record

H10 Hotel — kitchen

Kitchen suppression system installation; check against the existing H10 reference.

2019 final invoice

Jamaica Broilers — Spring Village

Installation assignment; exact system to confirm.