2022 final claim
NCB Junction
Fire alarm system supply and installation.
Additional project records
A working list compiled from Notmar project records. Names and scopes are being reviewed; dates refer to the records. Project values are omitted.
2022 final claim
Fire alarm system supply and installation.
2024 final claim
Fire detection and suppression works.
2022 claim; 2026 service correspondence
Electrical and mechanical services; fire alarm maintenance appears in later records.
2015 final claim
Fire system piping.
2017–2018 final invoices
Kitchen fire protection work and fire equipment.
2019 final invoice
Installation of a kitchen suppression system.
2019 final invoice
Fire suppression work.
Final claim on record
Fire protection works.
2017 final invoice
Project assignment; detailed scope to confirm.
2018 final claim
Fire sprinkler and fire alarm works. Check against the existing S Hotel entry to avoid duplication.
2017–2018 final invoices
Fire alarm and sprinkler systems.
2018 final invoice
Fire alarm works for branch renovation.
2018 final invoice
Project assignment; detailed scope to confirm.
2018 final invoices
Kitchen suppression system and fire alarm installation.
2018 final invoice
Fire alarm system installation.
2018 final invoice
Project assignment; detailed scope to confirm.
2019 final invoices
Work at the hotel; detailed scope to confirm.
2018 final invoices
Project assignment; detailed scope to confirm.
2018 final invoice
Fire equipment installation.
2019 final invoice
Project assignment and variation; detailed scope to confirm.
2018 and 2019 final invoices
Project assignment with Denron Engineering; detailed scope to confirm.
2020 final invoice
Pump supply.
2020 final invoice
Work at the two premises; detailed scope to confirm.
Final invoice on record
Project assignment; detailed scope to confirm.
2020 final invoice
Work at the exchange; detailed scope to confirm.
Final invoice on record
Work at the exchange; detailed scope to confirm.
2020 final invoice
Work at the exchange; detailed scope to confirm.
Final invoice on record
Fire suppression work.
2020 final invoice
Work at the exchange; detailed scope to confirm.
2014 final invoice
Project assignment; detailed scope to confirm.
2020 final invoice
Supply and installation of a fire alarm panel.
Final invoice on record
Installation of a Fike annunciator.
2020 final invoice
Fire alarm assignment.
2019 final invoice
Electrical items for a pump.
2020 final invoice
Fire alarm panel CPU supply and replacement.
2020 final invoice
Floor drains.
2020 final invoice
Project assignment; detailed scope to confirm.
2018 final invoice
Kitchen system repairs.
2018 final invoice
Warehouse assignment; detailed scope to confirm.
2016 final invoice
Assignment through Lesmack; detailed scope to confirm.
2017 final invoice
Assignment at St. Jago; detailed scope to confirm.
Final invoice on record
Project assignments; detailed scope to confirm.
Servicing final invoice on record
Servicing and devices. Separate from the earlier installation reference.
2017 final invoice
Project assignment; detailed scope to confirm.
2020 final claim
Fire hose reels and extinguishers.
2014–2015 final account records
Project assignment and as-built drawings; facility name and scope to confirm.
2015 final invoice
Work at the exchange; detailed scope to confirm.
Final invoice on record
Warehouse repairs; detailed system scope to confirm.
2016 final invoices
Sprinkler system and related variations.
2016 final invoices
Pump installation and associated supply-line work.
2019 final invoice
Water tank assignment; detailed scope to confirm.
2017 final invoice
Materials for the Star Café assignment; detailed scope to confirm.
2017 records
Servicing and repairs; detailed scope to confirm.
2015–2020 final invoices
Kitchen suppression and associated service work.
2020 final invoice
Immigration area modification work; detailed scope to confirm.
2019 final invoice
Sprinkler works; check against the existing airport references for overlap.
Final invoice on record
Project assignment; detailed scope and facility name to confirm.
2020 final invoice
Project assignment; detailed scope to confirm.
Final invoice on record
Kitchen suppression system installation; check against the existing H10 reference.
2019 final invoice
Installation assignment; exact system to confirm.